After Hurricane Sandy left the small resort town of Beach Haven Terrace underwater, all structures were required to be raised to protect against future storm damage. This included their water treatment plant. Pleased with the cost-savings and performance of an older 2005 upgrade, the Island once again selected the Tonka Water Brand to assist with the replacement water treatment plant needed after the storm. Download the case study here.
From the invention of the first electric
solenoid metering pump, to now
offering a full range of chemical
metering and disinfection systems,
ProMinent remains focused on
advancing our offerings to stay at
the forefront of growing market
challenges. This ensures our
customers receive reliable, durable,
low-maintenance, and economical
solutions that meets the needs of
specific applications for any situation.