News

Long Beach Township, NJ Case Study

After Hurricane Sandy left the small resort town of Beach Haven Terrace underwater, all structures were required to be raised to protect against future storm damage. This included their water treatment plant. Pleased with the cost-savings and performance of an older 2005 upgrade, the Island once again selected the Tonka Water Brand to assist with the replacement water treatment plant needed after the storm. Download the case study here

More posts

At GP Jager, we’re committed to providing top-quality solutions for your municipal wastewater needs. That’s why we’re excited to offer you a FREE Muffin Monster® T-Shirt when you inquire about JWC Environmental’s famous Muffin Monster® product line.
Catch up on the latest news from Anua: New Installations, Upcoming Conferences, and Anua’s One Place Septic Solution